Rotten roof boards were replaced with lumber custom cut in May. |
Rafters, 26 feet long, were needed to replace old rotten rafters. |
|
|
|
The repaired bin walls can be seen directly below the long rafters. |
A hole in the roof is left to receive a dormer similar to the one removed. |
|
A complete repair job and a new dormer. The cupola was stripped and insulated, ready for siding. |
|
|
|
Ready for fascia board. |
Ready for insulation. |
|
|
|
The insulation is between the old deck boards and the outer OSB sheets. |
It's looking good for an almost perfectly flat roof. Shingles are next. |