|
|
|
Doorways were cut in the middle of the bin walls on the outside bins. |
The bin chutes were removed and a floor was laid in the outside bins. |
|
|
|
The top 4 ft. of the bins removed 80 plus years ago were rebuilt. |
This is the rear stairway coming into the bins on the second floor. |