Work began in mid December gutting the front office. 

 

This is the west side of the office. The doorway is to the steps leading upstairs.

 

 

This is looking east and to the bathroom in the back.

  This is looking east and to the porch in the front.

 

 

This is the front porch.  It was be completely removed. 

 

When the drop ceiling came down, so did the chaff used for insulation.

 

 

When the drop ceiling came down, there was another waiting above it. 

 

Support beams above the drop ceiling were in pristine condition. 

 

 Back